OVERVIEW:

Workover is the term used to describe the variety of remedial operations performed on a producing well to try to increase or re-instate production after it has been initially drilled and completed.
The ADS Workover Well Control manual - in printed and CD format - aims to provide the essential knowledge required to carry out workover operations in a safe and controlled manner. The manual is available as a stand-alone reference, or can be used in conjunction with the IADC WellCAP certification courses (for which it is fully accredited).
 
 

CONTENT:

  • Fundamental Principles of Rig Well Control
  • Well Control Methods
  • Reasons for Workovers
  • Well Intervention Services
  • Prevention of Formation Damage
  • Pressure Basics
  • Production Well Kill Methods
  • Wireline, Coiled Tubing, Snubbing and Completion Equipment
  • API Guidelines (API RP53 and 6A)
  • Formulae and Conversion Factors Used in Well Control
  • Hydrate Formation and Prevention
  • Kill Sheets

 

The Workover Well Control Manual can be purchased in either the printed or CD format for £95.00 + Vat. (or $190)