Enhanced Pre-Spud Session

 
     
 

DURATION

1 or 2 days (variable)

DESIGNED FOR

The drilling team

COURSE OVERVIEW

A technical pre-spud event for the entire drilling team with the aim of preventing non-productive time (NPT) and thereby reducing costs. This is achieved through presentation of the well programme and the development of well-specific hole section action plans, along with specific technical modules designed to promote the avoidance of unscheduled events, while stressing throughout the importance of effective communication and team work.

COURSE CONTENT

• Causes and concerns of NPT
• Well plan presentation
• Presenting well-specific challenges and developing action plans to meet them
• The power of team brainstorming and planning
• How other team members can support your part of the operations and how you can support them
• "Drill the limit" and "drill the well on paper" activities BP licensed "Training to Reduce Unscheduled Events" (T.R.U.E.) modules available for inclusion in the course:

• Team building principles
• Investigation package
• Well plan
• Horizontal drilling
• Stuck pipe
• Casing/Cementing
• Lost circulation
• Well control
• Rig repair
• Drilling jars
• Down hole equipment failure
• Drill string failure

DATES

Available on request only (group training)

COST

Available on request for group training

For further information click here to email us.