"Workover Well Control"
Manual & CD (IADC Accredited)

 
     
 

OVERVIEW

Workover is the term used to describe the variety of remedial operations performed on a producing well to try to increase or re-instate production after it has been initially drilled and completed.

The ADS Workover Well Control manual - in printed and CD format - aims to provide the essential knowledge required to carry out workover operations in a safe and controlled manner. The manual is available as a stand-alone reference, or can be used in conjunction with the IADC WellCAP certification courses (for which it is fully accredited).

CONTENT

• Fundamental Principles of Rig Well Control
• Well Control Methods
• Reasons for Workovers
• Well Intervention Services
• Prevention of Formation Damage
• Pressure Basics
• Production Well Kill Methods
• Wireline, Coiled Tubing, Snubbing and Completion Equipment
• API Guidelines (API RP53 and 6A)
• Formulae and Conversion Factors Used in Well Control
• Hydrate Formation and Prevention
• Kill Sheets

COST

The Workover Well Control Manual can be purchased in either the printed or CD format for £95 + VAT (or $190)

For further information click here to email us.