|
OVERVIEW
Workover is the term used to describe the variety of remedial
operations performed on a producing well to try to increase or
re-instate production after it has been initially drilled and
completed.
The ADS Workover Well Control manual - in printed and CD format
- aims to provide the essential knowledge required to carry out
workover operations in a safe and controlled manner. The manual
is available as a stand-alone reference, or can be used in conjunction
with the IADC WellCAP certification courses (for which it is fully
accredited).
CONTENT
•
Fundamental Principles of Rig Well Control
• Well Control Methods
• Reasons for Workovers
• Well Intervention Services
• Prevention of Formation Damage
• Pressure Basics
• Production Well Kill Methods
• Wireline, Coiled Tubing, Snubbing and Completion Equipment
• API Guidelines (API RP53 and 6A)
• Formulae and Conversion Factors Used in Well Control
• Hydrate Formation and Prevention
• Kill Sheets
COST
The
Workover Well Control Manual can be purchased in either the printed
or CD format for £95 + VAT (or $190)
For
further information click here to email us.
|