Well pressure control is the most critical consideration in the
planning and performing of any well service operation. The awareness
of well pressure control in the prevention of injury to personnel,
harm to the environment and potential loss of facilities must
be fully appreciated by planning engineers and well site personnel.
This appreciation must include a sound knowledge of legislative
requirements, completion equipment, pressure control equipment
and operating practices and procedures.
The ADS Well Intervention Pressure Control manual - in printed
and CD format – aims to provide this essential knowledge.
The manual is available as a stand-alone reference, or can be
used in conjunction with the IWCF Well Intervention Pressure Control
certification course (for which it is accredited).
•
Classification of Completions
• Completion Equipment
• Well Control Methods:
- Barrier Theory
- Well Intervention Pressure Control
• Reasons for Well Interventions
• Well Intervention Services
• Prevention of Formation Damage
• Pressure Basics
• Production Well Kill Procedures
• Well Control Equipment
- Snubbing Operations
- Wireline Operations
- Coiled Tubing Operations
- Subsea Well Interventions
• Formulae and Conversion Factors used in Well control
• Preventers (Annular and Ram)
• Chokes
• Wireline Surface Pressure Control Equipment
• Coiled Tubing Surface Well Control Equipment
• Hydraulic Workover/Snubbing Equipment & Hazards
• Equipment-Specific Requirements
• Hydrate Formation & Prevention