|
DURATION
1-2
days (variable)
DESIGNED
FOR
The
ERD team
COURSE
OVERVIEW
A
pre-spud workshop for the implementation team of highly deviated
and extended-reach drilling operations. The course will familiarise
the team members with the differences between conventional and
extended-reach drilling and highlight issues important to the
successful drilling of the ERD well. A combination of lecture,
group discussion and practical scenarios will ensure that each
member of the team is prepared for the well-to-be-drilled.
COURSE
CONTENT
•
Hole cleaning & stuck pipe prevention in ERD wells
• Drilling practices
• Tripping practices
• Drill string design
• Torque & drag / swab & surge issues in ERD wells
• Hydraulics
• Directional drilling / surveying
• Drilling fluids
• Well control
• Casing running & cementing
• Casing wear
• Case histories
• Logistics
• Practical simulation exercises
[Also
available as an on-the-rig refresher course]
DATES
USA
Available on request
UK
Available on request
COST
Available
on request
For
further information click here to email us.
|